I've been loosely following this guy's reporting. He does a better job than the vast majority of the established media. Includes some explanation of the danger of running the powerplant with outlets covered. Interesting stuff.....

https://www.youtube.com/watch?v=c16dr9qzlZY

Huh...still doesn't look like a dam collapse is or ever was imminent.


Lunatic fringe....we all know you're out there.




GB1

Joined: Jan 2005
Posts: 53,303
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Jan 2005
Posts: 53,303
dam problems in Brazil ?

....hadn't heard about that, Thx

GTC


Member, Clan of the Border Rats
-- “Sometimes I wonder whether the world is being run by smart people who are putting us on or by imbeciles who really mean it.”- Mark Twain





Joined: May 2002
Posts: 10,245
FreeMe Offline OP
Campfire Outfitter
OP Offline
Campfire Outfitter
Joined: May 2002
Posts: 10,245
Originally Posted by crossfireoops
dam problems in Brazil ?

....hadn't heard about that, Thx

GTC


I thought it was a misplaced video at the beginning. You can skip his travelog intro to get right to the meat. Guy, just had to let us know he gets around, I guess.


Lunatic fringe....we all know you're out there.




Joined: Feb 2013
Posts: 1,893
M
Campfire Regular
Offline
Campfire Regular
M
Joined: Feb 2013
Posts: 1,893
must be common state workers!! How many fugheads does it take standing around to drill one hole?????????

Joined: Jan 2013
Posts: 267
K
Campfire Member
Offline
Campfire Member
K
Joined: Jan 2013
Posts: 267
Interesting that he's in Brazil, and the music is Cuban.

Saw another of his videos a couple days ago. Good footage and commentary on that one too.

IC B2

Joined: Jan 2005
Posts: 53,303
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Jan 2005
Posts: 53,303
The guy Brazil / Cuba guy LIKES attention, and to me seems a bit of an alarmist,.....
Oh well,....different strokes.
There's a LOT of good material being written (and downplayed) about the Oroville dam,....
Saved this, the other day,....there's a LOT to read between the lines and speculate about, methinks....

Link: http://www.mercurynews.com/2017/03/...ay-compares-to-orovilles-1968-structure/


Oroville Dam:
How a 21st-century spillway compares to Oroville’s 1968 structure

By DAN REIDEL, CHICO ENTERPRISE-RECORD |
PUBLISHED: March 22, 2017 at 5:57 am | UPDATED: March 22, 2017 at 8:13 am
Oroville – In the nearly 50 years since the Oroville Dam was completed, construction methods have changed.

Chico State University construction management professor Chris Souder consulted on the Folsom Dam auxiliary spillway project which began construction in 2008 and is on pace to be completed in October.


He also got a tour March 1 of the work going on at the Oroville Dam through the engineering contractor Syblon Reid out of Folsom. Souder said he wanted to take his college students to show them what their future careers might entail, but the Department of Water Resources wouldn’t allow it.

FORCE OF WATER

Although Souder isn’t an inspector or maintenance crew worker, he thinks visual inspections every one to two years should be enough with additional x-ray or sonar inspections that can indicate “caving, hollowing, undermining, basically if voids are present” every five to 10 years.

“There should be some or all these tests after a spillway has been used for an event,” he said.

“It’s pretty much common sense. It needs to be inspected and maintained so that there are no cracks in the concrete. Normal weathering is going to make that concrete more susceptible to that damage.”

And the water flowing down it can cause a lot of damage.

“At Folsom they directed the concrete has to be extra straight and strong,” he said. “Anything that the water can grab onto at that velocity, it will tear apart.”

That was illustrated when DWR continued releasing water through the spillway after spotting the hole. The release was an attempt to lower the lake level and not allow water over the emergency spillway. The water ripped away much of the main spillway below the hole and tore into the hillside on both sides of the structure.

Souder said the “baffles,” the enormous concrete blocks at the bottom of the Oroville spillway, were designed to slow the water down, which lessens the destructive force. The Folsom spillway has larger, steel-plated baffles and an extra element designed to slow water down.

“Folsom stepped the slabs every 7 to 30 feet once the slope was more than 30 degrees and depending how steep the slope,” Souder wrote. “There were almost 70 steps to slow the water.”

BUILDING IT TODAY


If Souder were in charge of building the Oroville Dam spillway using modern methods, he said he would build it thicker with more reinforcing steel and anchor it to the rock.

The Folsom spillway is a minimum of 42 inches thick. It’s thicker at some points where the rock is uneven, but the thinnest spot on the Folsom spillway is 42 inches.

The Oroville Dam spillway concrete is only 15 inches at its thinnest by design.

After seeing the construction up close, Souder said the original work could have been better reinforced, but it was well-built at the time.

“We learn from mistakes and time,” he wrote in an email.

The construction management professor recommended building the spillway with concrete 3 to 5 feet thick (36 to 60 inches) and with a crisscrossing “double mat” of reinforcing steel bars (rebar) an average diameter of one inch (rebar size No. 8) spaced 6 to 9 inches apart.

The original work had reinforcing steel, but Souder said it could have used more.

“There is reinforcing in the existing concrete, however, it is extremely light. It appears they barely reinforced the top and bottom double mats and what they did place has a spacing no closer than 12 inches,” he wrote.

The rebar in the original construction appeared to be about 3/4 inches in diameter (size No. 6), but Souder couldn’t get close enough to the broken pieces at the bottom of the spillway to see it up close.

Souder would also anchor the spillway concrete to the rock underneath.

The construction professor said the Oroville spillway was on a different type of rock than the Folsom spillway so it would be more difficult to anchor, but lengths of 8- to 16-foot-long rebar with hooks at the end are used to attach slabs of concrete to the rock underneath in modern building.

“Whether Oroville rock is/was competent enough to anchor to is a mystery, but if it is not, then you go deeper,” he wrote.

Although the concrete slabs made 50 years ago are essentially the same as they would be now — albeit thinner and with less rebar — Souder said he was surprised how many expansion joints were used compared to construction joints in the current structure.

Construction joints connect a concrete section with reinforcing steel extending from the end and fits it like a 3-D puzzle into the slab next to it.

The reinforcing steel rebar inside an expansion joint doesn’t extend into the next concrete slab, allowing the concrete at the joint to expand and contract from temperature and moisture changes, which can actually help prevent cracks, especially in large flat expanses of the material.

Souder said both joints are used together, but he thought there should be more construction joints and fewer expansion joints to strengthen the structure.

One other difference clear to Souder is the size of the side walls on the edges of the spillway.

In his experience working at the Folsom Dam spillway, Souder said the walls were a minimum of 30-feet tall and up to 80-feet at the bottom.

The Oroville spillway’s walls are only about 20-feet high.

WHAT’S NEXT?

Department of Water Resources acting director Bill Croyle said in a late February press conference the water agency was still trying to determine whether it will repair the broken spillway or build a new spillway.

He speculated the cost could be between $100 million and $200 million, but said it was too early to make a closer estimate.

The department hasn’t released any plans and apparently has only a rough timeline of when it will actually begin either fixing or replacing the broken spillway. Construction work at the site to date has been focused on clearing debris.

“As DWR further assesses damage to the flood control spillway, we will be able to better determine recovery efforts ­— experts are currently developing next steps and as current information is evaluated, the scope and magnitude of needed repairs is vetted and refined,” DWR public information officer Lauren Bisnett wrote in an email to this newspaper.

“Looking ahead, DWR’s goal is to have a fully functional spillway before next winter begins, and we’ll be working round-the-clock through spring, summer, and fall to make that happen. Within the next few weeks, DWR intends to have narrowed the approach for next winter to several options.”

NATIONWIDE PROBLEM

Another Chico State professor pointed out that while the break in the spillway is unique, aging dams are a problem across the country.

Steffen Mehl is the chair of the university’s Civil Engineering Department. Mehl’s background is in hydraulics and hydrology, and he also teaches courses in fluid dynamics.

“The best designs out there aren’t going to last if you don’t maintain them,” Mehl said.

The last “report card” from the American Society of Civil Engineers gave dams nationwide a “D” and noted that California has 678 dams that the engineer society considers “high hazard.”

Still, Mehl said the spillway endured more than 130,000 cubic-feet per second during storms in 1997 and came through without problems.

“It is uncharted a little bit,” he said. “I don’t think they saw this coming.”


One thing's for damn sure,.....there will be a LOT of $$$ out on the table for this project.

Gotta Wonder if secession from this great Union is still out on Governor Moonbeam's table smirk

GTC

Last edited by crossfireoops; 03/23/17.

Member, Clan of the Border Rats
-- “Sometimes I wonder whether the world is being run by smart people who are putting us on or by imbeciles who really mean it.”- Mark Twain





Joined: Mar 2003
Posts: 17,163
Campfire Ranger
Offline
Campfire Ranger
Joined: Mar 2003
Posts: 17,163
Thanks for posting this.


Randy
NRA
Patriot Life Benefactor





Joined: Jan 2005
Posts: 53,303
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Jan 2005
Posts: 53,303
Originally Posted by Hammerdown
Thanks for posting this.


my pleasure

The TEST CASE that this situation comprises, in terms of what we do on a nation wide basis v immediate local effects will no doubt continue to encourage me to update the updates,...

GTC


Member, Clan of the Border Rats
-- “Sometimes I wonder whether the world is being run by smart people who are putting us on or by imbeciles who really mean it.”- Mark Twain





Joined: Jan 2005
Posts: 53,303
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Jan 2005
Posts: 53,303
Originally Posted by FreeMe
Originally Posted by crossfireoops
dam problems in Brazil ?

....hadn't heard about that, Thx

GTC


I thought it was a misplaced video at the beginning. You can skip his travelog intro to get right to the meat. Guy, just had to let us know he gets around, I guess.


Got it, and watched it.....a LOT less, "alarmism" evident than in his previous YouTube release. His technical grasp of what's going on is in some cases CLEARLY still evident, but given the scope of what he's trying to cover he's obviously doing his best.
it IS nice to see this one V. his earlier stuff,... Maybe his trip to Rio cooled him out, and thx for posting !

GTC



Member, Clan of the Border Rats
-- “Sometimes I wonder whether the world is being run by smart people who are putting us on or by imbeciles who really mean it.”- Mark Twain





Joined: Nov 2002
Posts: 21,680
B
BMT Offline
Campfire Ranger
Offline
Campfire Ranger
B
Joined: Nov 2002
Posts: 21,680
Helpful post.



"The Church can and should help modern society by tirelessly insisting that the work of women in the home be recognized and respected by all in its irreplaceable value." Apostolic Exhortation On The Family, Pope John Paul II
IC B3

Joined: May 2002
Posts: 10,245
FreeMe Offline OP
Campfire Outfitter
OP Offline
Campfire Outfitter
Joined: May 2002
Posts: 10,245
Good article Cross'. Thanks.

Originally Posted by crossfireoops


Gotta Wonder if secession from this great Union is still out on Governor Moonbeam's table smirk



Reality bites. You'd think he'd be embarrassed, but the guy has no shame.


Lunatic fringe....we all know you're out there.





Moderated by  RickBin 

Link Copied to Clipboard
AX24

145 members (257wthbylover, 300_savage, 2ndwind, 17CalFan, 257_X_50, 21 invisible), 1,848 guests, and 988 robots.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums81
Topics1,190,599
Posts18,454,506
Members73,908
Most Online11,491
Jul 7th, 2023


 


Fish & Game Departments | Solunar Tables | Mission Statement | Privacy Policy | Contact Us | DMCA
Hunting | Fishing | Camping | Backpacking | Reloading | Campfire Forums | Gear Shop
Copyright © 2000-2024 24hourcampfire.com, Inc. All Rights Reserved.



Powered by UBB.threads™ PHP Forum Software 7.7.5
(Release build 20201027)
Responsive Width:

PHP: 7.3.33 Page Time: 0.073s Queries: 14 (0.003s) Memory: 0.8472 MB (Peak: 0.9486 MB) Data Comp: Zlib Server Time: 2024-04-19 06:15:05 UTC
Valid HTML 5 and Valid CSS