Pebble Mine wants to give Bristol Bay residents "dividends" from profits once it gets going, blatently buying them off.

Since this is on State land and resources, how the hell are they going to make that fly without giving those same dividends to all state residents? We all "own" the resources, thru the state. Communal capitalism, as it were....

Once they get up and running, (and they will as soon as they buy, blackmail, elect, or intimidate enough pols, judges, journalists, permit granters - it's a done deal, I'm afraid) They should have to pay royalties up there or greater than the oil companies, instead of the ridiculously low 1 or 2 % on the books for mining- whatever it is. Not to mention a muti billion dollar cleanup bond up front, in perpituity, not that that will remotely mitigate the guranteed eventual disaster to the watersheds.


The only true cost of having a dog is its death.

GB1

Joined: Jan 2011
Posts: 1,749
J
Campfire Regular
Offline
Campfire Regular
J
Joined: Jan 2011
Posts: 1,749
Originally Posted by las
Pebble Mine wants to give Bristol Bay residents "dividends" from profits once it gets going, blatently buying them off.

Since this is on State land and resources, how the hell are they going to make that fly without giving those same dividends to all state residents? We all "own" the resources, thru the state. Communal capitalism, as it were....

Once they get up and running, (and they will as soon as they buy, blackmail, elect, or intimidate enough pols, judges, journalists, permit granters - it's a done deal, I'm afraid) They should have to pay royalties up there or greater than the oil companies, instead of the ridiculously low 1 or 2 % on the books for mining- whatever it is. Not to mention a muti billion dollar cleanup bond up front, in perpituity, not that that will remotely mitigate the guranteed eventual disaster to the watersheds.

I dont support pebble, but guaranteed disaster might be a stretch..


For those without thumbs, it's s Garden fookin Island, not Hawaii
Joined: Jun 2001
Posts: 32,070
L
las Offline OP
Campfire 'Bwana
OP Offline
Campfire 'Bwana
L
Joined: Jun 2001
Posts: 32,070
I dont support pebble, but guaranteed disaster might be a stretch..[/quote]

It isn't. When is the Only question. 50, 500, 1,000 years. That toxic waste lake would be for virtually forever. Who is going to maintain the dam when mine closes in 75 or 100 years? How are they going to prevent "leakage" through a porous and faulted substrate?

But that wasn't the question.

Last edited by las; 06/17/20.

The only true cost of having a dog is its death.

Joined: Aug 2005
Posts: 15,676
Campfire Ranger
Offline
Campfire Ranger
Joined: Aug 2005
Posts: 15,676
They understand that most people are willing to sell their souls rather cheaply.


I was more or less neutral on Pebble. My position was to let the permitting process play out.


Then this happened and I have since changed my mind.


Brazil Dam Collapse








[Linked Image from i.pinimg.com]

Z
Joined: Feb 2001
Posts: 50,627
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Feb 2001
Posts: 50,627
Originally Posted by stevelyn
They understand that most people are willing to sell their souls rather cheaply.


I was more or less neutral on Pebble. My position was to let the permitting process play out.


Then this happened and I have since changed my mind.


Brazil Dam Collapse







Earthen dam failures of note would include Teton... failed during initial filling.

But what could possibly go wrong with a huge earthen dam built on a 2,000' deep sponge? Alaskans will foot all of the bill when it fails, get very, very little from it, and the money all goes out of country.


Mark Begich, Joaquin Jackson, and Heller resistance... Three huge reasons to worry about the NRA.
IC B2

Joined: Feb 2001
Posts: 50,627
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Feb 2001
Posts: 50,627
I just realized NAFTA was the legislation allowing Canadian companies to operate with far lower insurance and bonding requirements. Things may have changed on the front.


Mark Begich, Joaquin Jackson, and Heller resistance... Three huge reasons to worry about the NRA.
Joined: Feb 2001
Posts: 50,627
Campfire Kahuna
Offline
Campfire Kahuna
Joined: Feb 2001
Posts: 50,627
https://en.wikipedia.org/wiki/Teton_Dam

Teton Dam
From Wikipedia, the free encyclopedia
Jump to navigationJump to search
Teton Dam
(IDAHO-L-0010) Teton Dam Flood - Newdale.jpg
Catastrophic failure on June 5, 1976
Teton Dam is located in IdahoTeton Dam
Location in eastern Idaho
Official name Teton Dam
Country United States
Location Fremont & Madison counties, Idaho
Coordinates 43°54′35″N 111°32′21″WCoordinates: 43°54′35″N 111°32′21″W
Purpose Flood control, irrigation
Construction began 1972[1]
Opening date 1976
Demolition date June 5, 1976 (failure)
Construction cost $48,825,000
Owner(s) U.S. Bureau of Reclamation
Dam and spillways
Type of dam Embankment dam
Impounds Teton River
Height 305 ft (93 m)
Length 3,100 ft (940 m)
Width (base) 1,700 ft (520 m)
Reservoir
Creates Teton Reservoir
Total capacity 288,250 acre feet (355,550,000 m3)[2]
Normal elevation 5,320 ft (1,620 m) AMSL[2]
The Teton Dam was an earthen dam on the Teton River in Idaho, United States. It was built by the Bureau of Reclamation, one of eight federal agencies authorized to construct dams.[3] Located in the eastern part of the state, between Fremont and Madison counties, it suffered a catastrophic failure on June 5, 1976, as it was filling for the first time.

The collapse of the dam resulted in the deaths of 11 people[4] and 13,000 cattle. The dam cost about $100 million to build and the federal government paid over $300 million in claims related to its failure. Total damage estimates have ranged up to $2 billion.[5] The dam has not been rebuilt.


History and geology
There had been interest in building a dam in the eastern Snake River Plain for many years to control spring runoff and provide a more constant water supply in the summer. The area had suffered a severe drought in 1961, followed by severe flooding in 1962. The Bureau of Reclamation (USBR) proposed the Teton Dam in 1963 and Congress passed without opposition an authorizing bill the following year. The planned dam was to be an earthen structure 310 feet (94 m) high and 0.6 miles (1.0 km) long and create a reservoir 17 miles (27 km) in length. The impounded water would be used to generate hydroelectric power. An environmental impact statement was issued for the dam in 1971, but it did not raise the possibility of a collapse.[3] Lack of funding and of site prep work and questions surrounding the required environmental impact statement stalled the project. Barely 14 pages long, the statement quickly drew the ire of opponents of the project.[6]

On September 27, 1971, several environmental and conservation groups filed a lawsuit in Idaho District Court to stop the construction. Opponents of the dam questioned the project's justifications. They argued that damming a wild and scenic river and destruction of its trout fishery and other wildlife habitat would "replace a unique resource with a vulgar one." The suit questioned the economic return on investment, the Bureau's compliance with the National Environmental Policy Act and the geologic soundness of the dam's location.[6] Concerns over the seismic conditions of the dam site delayed the bid process pending further review by the Department of the Interior. Pressure from Idaho's congressional delegation stopped the review and in spite of the lawsuit, bids were taken in Idaho Falls on October 29, 1971.[6] The contract was awarded to Morrison-Knudsen Co. of Boise, assisted by Peter Kiewit Sons Co. of Omaha, Nebraska. The $39 million contract was awarded in December 1971. In spite of the lawsuit, work began in February 1972. After various motions, amended complaints, attempted injunctions and appeals, the suit was dismissed on December 23, 1974.[6]

The eastern Snake River Plain is almost entirely underlain by basalt erupted from large shield volcanos on top of rhyolitic ash-flow tuff and ignimbrites.[7] The tuff, a late-Cenozoic volcanic rock is 1.9 million years old. The dam site is composed of basalt and rhyolite, both of which are considered unsuitable for dam construction because of their high permeability. This was confirmed by long term pump-in tests at rates of 165 to 460 US gallons (620 to 1,740 litres) per minute.[8] Test cores, drilled by engineers and geologists employed by the Bureau of Reclamation, showed that the canyon rock at the dam site is highly fissured and unstable, particularly on the right side (as one faces the direction of flow). The widest fissures were determined to be 1.7 inches (4.3 cm) wide. The Bureau planned to seal these fissures by injecting grout into the rock under high pressure to create a grout curtain in the rock.

In addition, an investigation of the area by geologists of the U.S. Geologic Survey indicated that it was seismically active: five earthquakes had occurred within 30 miles (50 km) of the dam site in the previous five years, two of which had been of significant magnitude. This information was provided to the Bureau of Reclamation in a memorandum, but the geologists' concerns were considerably watered down in the six-month re-drafting process before the USGS sent the final version of the memo to the USBR in July 1973.[3]

In 1973, when the dam was only half built, but almost $5 million had already been spent on the project, large open fissures were encountered during excavation of the keyway trench near the right end of the dam, about 700 feet (210 m) from the canyon wall. The two largest, near-vertical fissures trended generally east-west and extended more than 100 feet (30 m) below the bottom of the key trench. Some of the fissures were lined with calcite, and rubble filled others. Several voids, as much as 6 inches (15 cm) wide, were encountered 60 to 85 feet (18 to 26 m) below the ground surface beyond the right end of the dam and grout curtain.[8] The largest fissures were actually caves large enough to enter. One of them was eleven feet (3.4 m) wide and a hundred feet (30 m) long. Another one was nine feet (2.7 m) wide in places and 190 feet (60 m) long. These were not grouted because they were beyond the keyway trench and beyond the area where the Bureau had decided grouting was required.[9] This necessitated using twice as much grouting as had been originally anticipated: the total injected grout included 496,515 cubic feet of cement, 82,364 cubic feet of sand, 132,000 pounds of bentonite, and 418,000 pounds of calcium chloride, injected into 118,179 lineal feet of drilled holes.[8]

Later, the report of a committee of the House of Representatives which investigated the dam's collapse felt that the discovery of the caves should have been sufficient for the Bureau of Reclamation to doubt its ability to fill them in with grout, but this did not happen; even after the dam had failed, the Bureau continued to insist that the grouting was appropriate.[3]

In December 1972, concerned about the geological conditions of the Teton River Canyon, USGS geologist David Schleicher wrote about the Teton Dam, still under construction, "A final point is that flooding in response to seismic or other failure of the dam—probably most likely at the time of highest water—would make the flood of February 1962 look like small potatoes. Since such a flood could be anticipated, we might consider a series of strategically-placed motion-picture cameras to document the process."[6]

Filling
The dam was completed in November 1975 and filling the reservoir began at the standard rate of 1 foot (0.30 m) a day. However, snows were heavy that winter and five months later the project's construction engineer requested permission to double the filling rate in order to deal with the additional spring run-off, while continuing to inspect for leaks and monitor the groundwater. A month later, even though monitoring showed that groundwater was flowing a thousand times faster than had been originally anticipated, the filling rate was doubled again, to 4 feet (1.2 m) a day.[3]

On June 3 and 4, 1976, three small springs were discovered downstream of the dam, although the water running through the leaks was clear and such leaks are not unexpected for an earthen dam. At the time, the reservoir was almost at capacity, with a maximum depth of 240 feet (73 m). The only structure that had been initially prepared for releasing water was the emergency outlet works, which could carry just 850 cubic feet per second (24 m3/s). The main outlet works and spillway gates were not yet in service: the gates were cordoned off by steel walls while they were being painted.

Collapse and flood
Breach of Teton Dam, June 5, 1976

The dark brown streak on the dam face near the gray bedrock in the left half of the photo is a leak that formed on the morning of June 5. The speck above the leak near the top of the dam is a D-9 bulldozer on its way to push dirt into the leak.



Large amounts of mud are now spilling down the face of the dam, unchecked by the efforts of the bulldozer operators. The outlet works at the foot of the dam are flooding with muddy water.



The dam is now breached and muddy water flows violently over the dam face.



The breach has now widened to nearly its full extent. The outlet works are completely inundated with muddy water.

On Saturday, June 5, 1976, at 7:30 a.m. Mountain Daylight Time (MDT), a muddy leak appeared, suggesting sediment was in the water, but engineers did not believe there was a problem. By 9:30 a.m. the downstream face of the dam had developed a wet spot which began to discharge water at 20 to 30 cubic feet per second (0.57 to 0.85 m3/s) and the embankment material began to wash out. Crews with bulldozers were sent to plug the leak, but were unsuccessful. Local media appeared at the site and at 11:15 officials told the county sheriff's office to evacuate downstream residents. Work crews were forced to flee on foot as the widening gap, now larger than a swimming pool, swallowed their equipment. The operators of two bulldozers caught in the eroding embankment were pulled to safety with ropes.[10]

At 11:55 a.m. MDT (UTC−17:55), the crest of the dam sagged and collapsed into the reservoir; two minutes later the remainder of the right-bank third of the main dam wall disintegrated. Over 2,000,000 cubic feet per second (57,000 m3/s) (many times the average flow rate of Niagara Falls) of sediment-filled water emptied through the breach into the remaining 6 miles (10 km) of the Teton River canyon, after which the flood spread out and shallowed on the Snake River Plain. By 8:00 p.m. that evening, the reservoir had completely emptied, although over two-thirds of the dam wall remained standing.[10]

Cause
Study of the dam's environment and structure[11] placed blame for the collapse on the permeable loess soil used in the core and on fissured (cracked) rhyolite in the abutments of the dam that allowed water to seep around and through the earth fill dam. The permeable loess was found to be cracked. It is postulated that the combination of these flaws allowed water to seep through the dam and led to internal erosion, called piping, that eventually caused the dam's collapse.

An investigating panel had quickly identified piping as the most probable cause of the failure, then focused its efforts on determining how the piping started. Two mechanisms were possible. The first was the flow of water under highly erodible and unprotected fill, through joints in unsealed rock beneath the grout cap and development of an erosion tunnel. The second was "cracking caused by differential strains or hydraulic fracturing of the core material." The panel was unable to determine whether one or the other mechanism occurred, or a combination:

The fundamental cause of failure may be regarded as a combination of geological factors and design decisions that, taken together, permitted the failure to develop.

A wide-ranging controversy ensued from the dam's collapse. According to the Bureau of Reclamation, Bureau engineers assess all Reclamation dams under strict criteria established by the Safety of Dams program. Each structure is periodically reviewed for resistance to seismic activity, for internal faults, and for physical deterioration.[4] The dam safety program identified two other dangerous dams – Fontenelle, which very nearly failed 11 years earlier, when it was filled, in a manner similar to the Teton Dam,[12] and again in May 1985;[13][14] and the Jackson Lake Dam which would have failed during an earthquake on the nearby Teton Fault.

Deaths, damage and property claims

Rexburg flooded

Teton Dam ruins in 2004
Teton Canyon ends approximately six miles below the dam site, where the river flows onto the Snake River Plain. When the dam failed, the flood struck several communities immediately downstream, particularly Wilford at the terminus of the canyon, Sugar City, Salem, Hibbard and Rexburg. Thousands of homes and businesses were destroyed. The small agricultural communities of Wilford and Sugar City were wiped from the river bank. Five of the fourteen deaths attributed to the flood occurred in Wilford. The similar community of Teton, on the south bank of the river, is on a modest bench and was largely spared.[15] One Teton resident was fishing on the river at the time of the dam failure and was drowned. An elderly woman living in the city of Teton died as a result of the evacuation.[16]

One estimate placed damage to Hibbard and Rexburg area, with a population of about 10,000, at 80 percent of existing structures. The Teton River flows through the industrial, commercial and residential districts of north Rexburg. A significant reason for the massive damage in the community was the location of a lumber yard directly upstream. When the flood waters hit, thousands of logs were washed into town. Dozens of them hit a bulk gasoline storage tank a few hundred yards away. The gasoline ignited and sent flaming slicks adrift on the racing water.[17] The force of the logs and cut lumber and the subsequent fires practically destroyed the city.

The flood waters traveled west along the route of the Henrys Fork of the Snake River, around both sides of the Menan Buttes, significantly damaging the community of Roberts. The city of Idaho Falls, even further down on the flood plain, had time to prepare. At the older American Falls Dam downstream, engineers increased discharge by less than 5% before the flood arrived.[18] That dam held and the flood was effectively over, but tens of thousands of acres of land near the river were stripped of fertile topsoil.[5]

The force of the failure destroyed the lower part of the Teton River, washing away riparian zones and reducing the canyon walls. This seriously damaged the stream's ecology and impacted the native Yellowstone cutthroat trout population. The force of the water and excessive sediment also damaged stream habitat in the Snake River and some tributaries, as far downstream as the Fort Hall bottoms.

After the dam's collapse, debris clean-up began immediately and took the remainder of the summer. Rebuilding of damaged property continued for several years. Within a week after the disaster, President Gerald Ford requested a $200 million appropriation for initial payments for damages, without assigning responsibility for Teton Dam's failure.[19]

The Bureau of Reclamation set up claims offices in Rexburg, Idaho Falls and Blackfoot. By January 4, 1977, disaster victims filed over 4,800 claims totalling $194 million. By that date, the federal government paid 3,813 of those claims, $93.5 million. Originally scheduled to end in July 1978, the claims program continued into the 1980s. At the end of the claims program in January 1987, the federal government had paid 7,563 claims for a total amount of $322 million.

No plans have been made for rebuilding the Teton Dam, but its reconstruction has been discussed over the years since its failure.[20][21]


Mark Begich, Joaquin Jackson, and Heller resistance... Three huge reasons to worry about the NRA.
Joined: Dec 2010
Posts: 1,869
U
Campfire Regular
Offline
Campfire Regular
U
Joined: Dec 2010
Posts: 1,869
I remember the collapse of the Teton Dam....


"The more I am around people the better I like my dog." Mark Twain
Joined: Aug 2005
Posts: 15,676
Campfire Ranger
Offline
Campfire Ranger
Joined: Aug 2005
Posts: 15,676
Originally Posted by Sitka deer
I just realized NAFTA was the legislation allowing Canadian companies to operate with far lower insurance and bonding requirements. Things may have changed on the front.



It doesn't help that the US govt and their eco-nazi minions have run all the American mining companies out of business.


[Linked Image from i.pinimg.com]

Z

Moderated by  RickBin 

Link Copied to Clipboard
AX24

544 members (02bfishn, 160user, 1beaver_shooter, 10gaugemag, 10ring1, 16penny, 56 invisible), 2,416 guests, and 1,158 robots.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums81
Topics1,191,222
Posts18,466,471
Members73,925
Most Online11,491
Jul 7th, 2023


 


Fish & Game Departments | Solunar Tables | Mission Statement | Privacy Policy | Contact Us | DMCA
Hunting | Fishing | Camping | Backpacking | Reloading | Campfire Forums | Gear Shop
Copyright © 2000-2024 24hourcampfire.com, Inc. All Rights Reserved.



Powered by UBB.threads™ PHP Forum Software 7.7.5
(Release build 20201027)
Responsive Width:

PHP: 7.3.33 Page Time: 0.068s Queries: 14 (0.002s) Memory: 0.8448 MB (Peak: 0.9816 MB) Data Comp: Zlib Server Time: 2024-04-24 19:00:03 UTC
Valid HTML 5 and Valid CSS