24hourcampfire.com
24hourcampfire.com
-->
Previous Thread
Next Thread
Print Thread
Hop To
Joined: Mar 2007
Posts: 9,097
Starman Offline OP
Campfire Outfitter
OP Offline
Campfire Outfitter
Joined: Mar 2007
Posts: 9,097
been around 500-650t mobile cranes on site,
and they get impressive when extended with
all the add-ons..
but never anything like this..😁







-Bulletproof and Waterproof don't mean Idiotproof.
GB1

Joined: Sep 2014
Posts: 21,768
Campfire Ranger
Offline
Campfire Ranger
Joined: Sep 2014
Posts: 21,768
Liebherr would be such an awesome company to be an engineer for.
If I was graduating school with that degree, I would be begging them for a job.
It seems like they are cutting edge in every market they are in.


Parents who say they have good kids..Usually don't!
Joined: Oct 2012
Posts: 631
Campfire Regular
Offline
Campfire Regular
Joined: Oct 2012
Posts: 631
Awesome. Can’t imagine the cost and the expense to hire.


NRA Life Member

"You might as well be wrong, as be right and not know it"
Joined: Mar 2007
Posts: 9,097
Starman Offline OP
Campfire Outfitter
OP Offline
Campfire Outfitter
Joined: Mar 2007
Posts: 9,097
Originally Posted by Quartermaster
Can’t imagine the cost and the expense to hire.


Sometimes the actual lift can only take an hour
or so, but one has to factor in job location/travel
time, set up /take down time which could amount
to a number of days...one may not require
anywhere near 1200t lift cap. but still require
the big boy for reach.(max tip height 550 ft
with lattice and folding jib.)

[Linked Image from i.postimg.cc]


-Bulletproof and Waterproof don't mean Idiotproof.
Joined: Dec 2004
Posts: 14,487
Campfire Outfitter
Offline
Campfire Outfitter
Joined: Dec 2004
Posts: 14,487
I can only imagine the scope of the disaster that could take place if an operator makes an error with a machine like that. The potential mayhem is staggering.


Don't be the darkness.

America will perish while those who should be standing guard are satisfying their lusts.


IC B2

Joined: Mar 2007
Posts: 9,097
Starman Offline OP
Campfire Outfitter
OP Offline
Campfire Outfitter
Joined: Mar 2007
Posts: 9,097
Organizing a lift in a big city can get rather
complex, it's not just about blocking streets
and diverting traffic,etc , sometimes engineers
need to see if the ground is strong enough,...ie:
there may be rail tunnels not far underneath
and collapse of such would be serious disaster
effecting many things well beyond the job site.


-Bulletproof and Waterproof don't mean Idiotproof.
Joined: Sep 2017
Posts: 2,795
M
Campfire Regular
Offline
Campfire Regular
M
Joined: Sep 2017
Posts: 2,795
This bring back nightmares of working for a German company. They can take the simplest thing and make it complex. I bet that the FMEA is 100,000 pages on that machine.

Joined: Jan 2020
Posts: 2,831
T
Campfire Regular
Online Content
Campfire Regular
T
Joined: Jan 2020
Posts: 2,831
Liebherr makes one hell of a crane.
Are you doing a water treatment project ?


Just because you're offended doesn't mean your right.

Moderated by  RickBin 

Link Copied to Clipboard
AX24

536 members (1beaver_shooter, 10gaugemag, 1Akshooter, 17CalFan, 007FJ, 1337Fungi, 50 invisible), 2,604 guests, and 1,184 robots.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums81
Topics1,191,330
Posts18,468,566
Members73,928
Most Online11,491
Jul 7th, 2023


 


Fish & Game Departments | Solunar Tables | Mission Statement | Privacy Policy | Contact Us | DMCA
Hunting | Fishing | Camping | Backpacking | Reloading | Campfire Forums | Gear Shop
Copyright © 2000-2024 24hourcampfire.com, Inc. All Rights Reserved.



Powered by UBB.threads™ PHP Forum Software 7.7.5
(Release build 20201027)
Responsive Width:

PHP: 7.3.33 Page Time: 0.119s Queries: 14 (0.004s) Memory: 0.8214 MB (Peak: 0.8782 MB) Data Comp: Zlib Server Time: 2024-04-25 18:13:24 UTC
Valid HTML 5 and Valid CSS