This used to be my setup. It was in our "working kitchen" which used to be the kitchen of our sandwich shop. Mrs. Aqualung makes candy in the area or bakes cookies or is otherwise working in the area. We had to coordinate our activities for me to do some loading.

[Linked Image]

Then, as her operations got more extensive, we finally decided to move my reloading operation upstairs into our library/office.

I scrounged some spare cubicle components from work.

Here are some photos of the construction:
[Linked Image]

The bench is screwed to the nailer using L-brackets on top and bottom of the countertop. The upper cabinet holds dies and powder.

Drawer cabinets underneath to store tools, etc.
[Linked Image]

Finished bench in operation, loading up some ammo for this past hunting season.
[Linked Image]

Total cost of bench was about $5.00 for brackets and screws. All other components scrounged...there are some perks to being a Facilities Manager.

Aqualung



"Bambi's Good Eatin'!"
- Me

"...Somewhere, there are Brownings in a two-hand hold,
Cocked and locked, one up the spout..."
- Jethro Tull