Toe doesn't match but since the toe is beveled anyway I will strip it and build it up:
[Linked Image]

Since the toe has to be built up I drilled holes so the stock has 1/4" toe out:
[Linked Image]

Before view of ADJ LOP Kit before reworking the stock:
[Linked Image]

LOP will be 12.375" to 13.875":
[Linked Image]

I originally picked up this threaded bushing at Lowes to install the stock hardware. Don't use one unless you are going to bore out the hole and just bed it in place. It's head stripped and I had to drill it out of the stock and use a larger bushing:
[Linked Image]

Bushings epoxied in to the stock and waiting to cure (you can also see at the heel where it was stripped and hit with a Dremel to roughen it and ready it for build up):
[Linked Image]

I built the toe and heel up with Bondo:
[img]http://i1225.photobucket.com/a...ds/20150321_150009_zpshfoh8d5q.jpg[/img]

It has a working time of 3-5 minutes so the first layer went on en mass:
[img]http://i1225.photobucket.com/a...ds/20150321_170537_zpsyminorw0.jpg[/img]

I worked it down with a rasp to rough shape using a line traced around the pad as my safety buffer and used a straight edge to QC my work:
[img]http://i1225.photobucket.com/a...ds/20150322_102317_zpsmkjhac7d.jpg[/img]