Always happens when you need it most.

Been hot and dry, and not a hint of needed rain.

First, the 2 phase power line has an issue with a downed wire off a pole. The electric company can't get to the powerline on their easement, so they have to call in a dozer crew to clear the line for the lineman truck to access the downed line.

That takes close to a month...

Finished and fixed power line.

[Linked Image]

Then what happens? The well that irrigates 60,000 olive trees and provides water for cattle quits working... It's blowing $20 control box fuzes like they are candy without pumping much water.. frown

So I call the deep well guy.

AND... it takes 3 weeks or more to fix.

Water in the huge tank is barely there.

[Linked Image]

Pulling unit in place.

[Linked Image]

Turns out it wasn't the pump, but the motor.

New motor, and pulling the well and running everything back down-hole is gonna cost around $10k...

They should have that back down hole today. I'll be running that well for a few days, playing catch-up.