I just had a well Drilled on my property in Arizona.
They hit water at 190 ft @ 3 GPM
at 303 ft it was 5 to 6 GPM
at 325 ft it was 15 GPM
People in the area have some wells at 80 GPM
So I got Greedy and had the Drill Company continue Drilling in the hopes of getting more GPM
I had them stop drilling at 428 ft they estimated 15 + GPM.
Static water is estimated at 200 ft and possibly will jump to 190 ft

Now that you have the Particulars

I am planing on Building a Water house 8 ft X 12 ft with the Well Head inside of the House.
I will make the House disassemble so that if I need to get the Drill Rig back in I can do so with out taking the entire Shelter down
Treated wood foundation & Gravel or stepping stone floor.

I have a Friend in the area that says I should drop the pump at 250 ft.
I was thinking with more water over the pump it may be better for the pump and I was thinking to drop the pump to 300 ft.

For the guys that have Well Experience
Am I over thinking things or do you think that I am on the right track.

Any Advice would be appreciated.

Last edited by funshooter; 11/14/21.