Are you applying the trim on top of the lapped siding with out scribing and coping (notching) to fit tight, and then just filling the gap that remains with caulk? How thick is the siding, and how much exposed to the weather of each siding board? If just applying the trim over the siding and filling with caulk it sounds like a "Bubba Job".


The Tail Goes Along With The Hide.

We should have picked our own cotton.