Originally Posted by K1500
If I was stupid enough to use a front end loader to dump blocks into my 2500HD, I think I'd throw a sheet of 3/4" ply in the back first.


Overachiever!

1/2" OSB is plenty! laugh


If you take the time it takes, it takes less time.
--Pat Parelli

American by birth; Alaskan by choice.
--ironbender