24hourcampfire.com
24hourcampfire.com
-->
Previous Thread
Next Thread
Print Thread
Hop To
Joined: Jun 2011
Posts: 503
B
Campfire Regular
OP Offline
Campfire Regular
B
Joined: Jun 2011
Posts: 503
So something I probably could get from the man himself, but I figure the time he'd spend on the phone with me would be taking away from the time he has to work on someone's knife, and ultimately the longer it'll take to get the one I ordered last fall!

So, my question is this: When I got on the list last fall, there was little we discussed on the blade type and handle material and the like. Am I correct to assume that when my time comes closer, I will here from Mr Ingrams as to what pattern/steel/handles/pins I want? Approximately how far from production does he contact you if this is the case?


Brandon Gleason
GB1

Joined: Sep 2011
Posts: 2,649
T
Campfire Regular
Offline
Campfire Regular
T
Joined: Sep 2011
Posts: 2,649
It took me 14 months to get my two knives and it was about two months before that he asked for final confirmation.

Joined: Jun 2011
Posts: 503
B
Campfire Regular
OP Offline
Campfire Regular
B
Joined: Jun 2011
Posts: 503
Ok, perfect. Just making sure I'll be able to change my blade design. I was leaning towards a semi-skinner and now I'm thinking a B&T.


Brandon Gleason
Joined: Nov 2012
Posts: 3,034
W
Campfire Tracker
Offline
Campfire Tracker
W
Joined: Nov 2012
Posts: 3,034
I would send Mr. Ingram an email and ask for a update on your timeline and let him know your build details. Sometimes I have to make several small changes to my build during the email exchange and final build date, due in part to the valuable input from the knife maker and my ever changing ideas.

Joined: Jun 2011
Posts: 503
B
Campfire Regular
OP Offline
Campfire Regular
B
Joined: Jun 2011
Posts: 503
Originally Posted by woods_walker
I would send Mr. Ingram an email and ask for a update on your timeline and let him know your build details. Sometimes I have to make several small changes to my build during the email exchange and final build date, due in part to the valuable input from the knife maker and my ever changing ideas.


I did just that. Heard back early this AM from him with confirmation of my delivery date for late this year and some notation changes on my requests.


Brandon Gleason
IC B2


Moderated by  RickBin 

Link Copied to Clipboard
AX24

514 members (10ring1, 007FJ, 01Foreman400, 10gaugemag, 17CalFan, 19rabbit52, 49 invisible), 2,296 guests, and 1,209 robots.
Key: Admin, Global Mod, Mod
Forum Statistics
Forums81
Topics1,191,507
Posts18,472,321
Members73,936
Most Online11,491
Jul 7th, 2023


 


Fish & Game Departments | Solunar Tables | Mission Statement | Privacy Policy | Contact Us | DMCA
Hunting | Fishing | Camping | Backpacking | Reloading | Campfire Forums | Gear Shop
Copyright © 2000-2024 24hourcampfire.com, Inc. All Rights Reserved.



Powered by UBB.threads™ PHP Forum Software 7.7.5
(Release build 20201027)
Responsive Width:

PHP: 7.3.33 Page Time: 0.143s Queries: 14 (0.005s) Memory: 0.8057 MB (Peak: 0.8495 MB) Data Comp: Zlib Server Time: 2024-04-27 13:18:54 UTC
Valid HTML 5 and Valid CSS