Thanks Greg...Guys ! the reno was funded by a collector with deep pockets so much was done above and beyond code / ordinary building standards for a warehouse like tons of extra structural steel, radiant heat throughout the 6000 sq ft, three phase electric, alarm /video, sound system etc. We were very lucky on this one, maybe something good came out of the Corona virus....The negotiations seemed to pick up speed the last couple of months and then the deal was set.


Patron member, NRA, Life Member SCI,