Originally Posted by SKane
Originally Posted by Pabst

Leaning toward 22" #2 in 7/08 and his classic green stripe paint scheme. He said lead time is around 10 mo these days.


I would do prezactly this – paint scheme and all.


Exactly what I would do as well, however, I would do a 6.5 Creed.