Originally Posted by Hastings
Originally Posted by hasbeen1945
Go to the generac web page. You can figure the equipment you want to run and what size generator you need.
I just had a 22 kw installed. Should meet my power needs. Hasbeen
Generacs are on backorder most places, My Generac man says 25 to 30 weeks, Northern was saying 90 days. Been that way since the hurricanes and the California fires. If you have a Generac, be sure to check the oil every day. My 22 KW holds a little less than 2 qts. including the filter and easily uses a pint in 48 hours. I know of a few cases where they ended up with no oil on the stick or shut down due to low oil pressure. My neighbor up the road kept restarting his until it wouldn't restart. Cost a bunch to get it going again. Also watch the air intake, it can stop up with leaves and the engine doesn't cool too well.

Thanks for the heads up. Hasbeen


hasbeen
(Better a has been than a never was!)

NRA Patron member
Try to live your life where the preacher doesn't have to lie at your funeral