Originally Posted by Colorado1135
Originally Posted by JeffA
Grade changes can make a easy job a hassle.


we're on a flat lot, grade change might be 12" max across the whole thing but you couldn't tell by looking at it. I'd be surprised if it's even close to that


That's no problem, it's the simple to grade out 6 and 8 inch rapid inclines and drops that are best fixed before ya start.

30 years ago I installed chain link for 10 bucks a post, hard to believe I made money doing it for that rate.
Went up grades so steep you had to dig in foot holds to climb up for a couple hundred feet at times.
It looks great when installed right, lasts a good long while too.