|
|
Joined: Jan 2007
Posts: 11,650 Likes: 10
Campfire Outfitter
|
OP
Campfire Outfitter
Joined: Jan 2007
Posts: 11,650 Likes: 10 |
|
|
|
|
Joined: Apr 2011
Posts: 152,713 Likes: 54
Campfire Savant
|
Campfire Savant
Joined: Apr 2011
Posts: 152,713 Likes: 54 |
I’m glad I don’t do that anymore, big Machine and good crew can get a 1000’ a day
Last edited by hanco; 03/16/23.
|
|
|
|
Joined: May 2009
Posts: 1,295
Campfire Regular
|
Campfire Regular
Joined: May 2009
Posts: 1,295 |
160 or 200? New subdivision?
|
|
|
|
Joined: Jan 2007
Posts: 11,650 Likes: 10
Campfire Outfitter
|
OP
Campfire Outfitter
Joined: Jan 2007
Posts: 11,650 Likes: 10 |
160 or 200? New subdivision? if I remember right there was 120 some houses.
|
|
|
|
Joined: Jan 2007
Posts: 11,650 Likes: 10
Campfire Outfitter
|
OP
Campfire Outfitter
Joined: Jan 2007
Posts: 11,650 Likes: 10 |
I’m glad I don’t do that anymore, big Machine and good crew can get a 1000’ a day we got the machine , dig the main komatsu 360. when it gets deep and you have to use a trench box sure slows things down. wish we had enough manpower to have in that crew behind the ones Lane the main to go ahead and do the laterals at the same time instead of having to go back and do them
|
|
|
|
Joined: May 2009
Posts: 1,295
Campfire Regular
|
Campfire Regular
Joined: May 2009
Posts: 1,295 |
160 or 200? New subdivision? if I remember right there was 120 some houses. I meant pressure rating.
|
|
|
|
Joined: Jan 2007
Posts: 11,650 Likes: 10
Campfire Outfitter
|
OP
Campfire Outfitter
Joined: Jan 2007
Posts: 11,650 Likes: 10 |
160 or 200? New subdivision? if I remember right there was 120 some houses. I meant pressure rating. Oh .. 200
Last edited by ldholton; 03/16/23.
|
|
|
|
Joined: Apr 2011
Posts: 152,713 Likes: 54
Campfire Savant
|
Campfire Savant
Joined: Apr 2011
Posts: 152,713 Likes: 54 |
I’m glad I don’t do that anymore, big Machine and good crew can get a 1000’ a day we got the machine , dig the main komatsu 360. when it gets deep and you have to use a trench box sure slows things down. wish we had enough manpower to have in that crew behind the ones Lane the main to go ahead and do the laterals at the same time instead of having to go back and do them You have to install the waterline so deep you need a trench box??
|
|
|
|
Joined: Jan 2007
Posts: 11,650 Likes: 10
Campfire Outfitter
|
OP
Campfire Outfitter
Joined: Jan 2007
Posts: 11,650 Likes: 10 |
I’m glad I don’t do that anymore, big Machine and good crew can get a 1000’ a day we got the machine , dig the main komatsu 360. when it gets deep and you have to use a trench box sure slows things down. wish we had enough manpower to have in that crew behind the ones Lane the main to go ahead and do the laterals at the same time instead of having to go back and do them You have to install the waterline so deep you need a trench box?? on the water line no. around here the water line is usually 4 to 6 ft deep we try to keep it on a different elevation than electric or sewer.when I read your comment my brain was stuck in sewer mode after today.... I think I'm falling apart.. lmao
Last edited by ldholton; 03/16/23.
|
|
|
|
364 members (10gaugeman, 17CalFan, 10gaugemag, 12344mag, 160user, 1lessdog, 39 invisible),
13,722
guests, and
1,108
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
Forums81
Topics1,195,224
Posts18,543,906
Members74,060
|
Most Online21,066 May 26th, 2024
|
|
|
|
|