Here are a couple photos of the first working AICS left hand conversion.
I made a rough drawing and had Kent take a couple days on the mill with a chassis and some aluminum stock.
The final products, will have no visible screw holes and be CNC machined from one solid piece.
[Linked Image]

Note the block going back far enough to give protection to the safety and not allowing a ton of crap to get in the trigger and bottom side of the action.
[Linked Image]

We do reccomend bedding the chassis when getting this done. Bedding always helps keeping crud out of the action and trigger on any AICS. It also helps maintain a higher level of accuracy.

Price tag is not for the timid however. The conversion with bedding is going to run $350.00. Perhaps once we have the CNC'd parts we can come down, but until we get them CNC machined, they are hand made on the mill, each one. that takes alot of time!

NOTE
WE came up with this first! Anything else is a copy <img src="/ubbthreads/images/graemlins/wink.gif" alt="" />

Celt