Well, I am finally settling into my new shop. Today I though I would snap a few pictures of my new surroundings and share them with you. I have only been producing in the new shop for a couple of weeks, but it is already evident that I will have better throughput than ever before!
Here's a picture of my lathe. Directly opposite this area, I have room for my second lathe. I already have it wired and ready to put it in place.
Here is a picture of my fluting mill, and in the foreground is my barrel-vise.
Here's a picture of the "milling" end of the shop. That's my right-hand-man, Gordy by my vertical mill.
Another picture of the vertical mill.
Here is a shot of my assembly area that I also reload in. That's a Dillon 650 set-up in the background
Here's a picture of my parts storage in my assembly area.
[img]
http://i50.photobucket.com/albums/f340/dtech1/DSC_0281_s.jpg[/img]
This is my assembly area.
[img]
http://i50.photobucket.com/albums/f340/dtech1/DSC_0287_s.jpg[/img]
This is the shipping area, with the bead-blast cabinet on the right side.
[img]
http://i50.photobucket.com/albums/f340/dtech1/DSC_0300_s.jpg[/img]
This is the area where the barrels are polished and or Norrel's moly-resin applied. The exhaust hood is also used to remove the smoke from the indoor test-firing.
[img]
http://i50.photobucket.com/albums/f340/dtech1/DSC_0302_s.jpg[/img]