I'd poor the concrete a little higher than grade, embed some kind of anchor to the top of it, and then set the post on top of the footing rather than inside of it. To me, inside is asking for it to hold water and rot in time. on top, it stays dry, but if anything happens you can always replace it without disturbing your footing.