Originally Posted by renegade50
4 to 6 inches more drop would be good.
Pvc drop would be a bonus .
A bonus I need after all the jakked up schit I have encountered since starting.
To easy to pick axe some more depth to a cut in a pvc drop .
Stuff a rag in it.

Pick axe the slope , shovel it out.
Tamp the schit outta the clay bottom
Bed it with sand tamped
Bed pipe sides
Sand or gravel??
Get pipe hooked up.
Back fill it right.



Gotta keep on digging 1st...
Gravel bed tamped then gravel all the way around.