Originally Posted by Geno67
You should really ask the sanitary sewer people for your city if they have an as-built drawing for that sanitary sewer. If they do, we can calculate the grade at your tie in and be sure it's a straight shot.

With the two way cleanouts at both ends they can hydroblast the whole thing next time it get's sludged up.

I know man.

Didn't put a clean out in at the street end.
Later on this summer I'm gonna replace this old one by the house with a 2 way one like a member posted a pic of.
Looked at em at lowes.

I just wanted to get stuff done per all the issues today and have it up and running way better.