Originally Posted by BWalker
Then plan on getting a decent length of 3/8" rebar and using it was a pipe support. Drive it in the ground a foot or so then wire the pipe to it.


Why not a T post?


By the way, in case you missed it, Jeremiah was a bullfrog.