32 is certainly reasonable. Problem was, they installed these huge bulges on Midway in her later years and the parasitic drag was significant.
The 32 knot capability was less than ten years before decommissioning. And as I stated, at that point the boilers were nearly out of air, meaning that wouldn't have been a normal operating condition for the engineering plant.