Sounds like your load development was done as done in the right way. My only concern would be that sometimes “pressure signs” don’t show up until a load is way over acceptable pressure. I’m not trying to be overly critical here; but I would suggest using a chronograph when developing loads. Maybe the best $100 or so you’ll ever spend. By the way, welcome to the campfire.