Yesterday was concrete day.

The crew started the pour with the edges where the slab is thicker.

[Linked Image]

they used a boom truck with a remote telescoping belt that fed the concrete out to a drop chute. The owner of the truck walked around the outside of the pour and controlled exactly where the mix was dropping in. He had a wireless remote on his belt that controlled the swing, extension, feed rate, height etc. He also has an alarm button to signal to the concrete truck when to stop and start feeding the boom truck with each load of concrete that came.

[Linked Image]

Partial pour complete here, screeding with a 12' vibratory screed.

[Linked Image]

A couple of power trowels are finishing the top here.

[Linked Image]

[Linked Image]

I also got my rafters yesterday.

[Linked Image]

[img]http://i43.photobucket.com/albums/e364/northerndave/Mobile%20Uploads/IMG_2550_zpsfc76fdcb.jpg[/img]

[img]http://i43.photobucket.com/albums/e364/northerndave/Mobile%20Uploads/IMG_4049_zps5aae4f62.jpg[/img]

now we will start seeing some progress.