Originally Posted by mathman
Sounds logical, but I'm strictly a learner here.

What's the proposed remedy?


one of the front runners currently in the solution offerings would be to address the problem areas by chipping the loose material, scarify the shallow cavities or what ever the preferred surface prep is, then use a leveling material in those specific areas, then surface prep the entire slab with something like maybe steel shot blast and have a specialty contractor apply a professional industrial coating.

Something like that, we'll see. I don't really know yet, still analyzing the issue and developing that plan.

Another proposal is to scarify/grind the whole top and apply a 2" cap (another pour) over what is already there. There is a lot more detail involved in either option, but those are the 2 basic solution options I know of right now.