Originally Posted by 458 Lott
You could always have a core sample done.

I think if the oil and gas industry hired hands that read the text in the drawings, we'd be much closer to delivering what the engineers designed shocked


In my experience the hired hands are directed by their project management to do the minimum and see what they can get away with. Our QA teams have grown by leaps and bounds because of this.


Conduct is the best proof of character.