0.3'

I was happy with with the results using the Quad map. Although Saginaw, MI has very little Elevation change.

Lee- The FHWA has changed lots of things on bridge design over the last few years. LFRD is the design method required for any new bridges. I have just completed a scour analysis of all the bridges in my county. Do you have any comments on spread footings?