The more I look at that pic the easier it gets. Man, have a guy come build a tank on-site. You guys provide the material. I bet a good fab guy could build both tanks in place in one day. Maybe cost you guys 3K total, tops for both.

It'd cost you way more than that rerouting and relocating the mixer. That'd be 2-3 days on each minimum, I'd bet looking at it.