this project has been going on about four years now. It was intended and probably will be the last hurrah now. Age and back issues.
But the decision was made to make a basement under a eventual slab and workroom. There was no way to get equipment in so it had to be done by hand.
it measures 7feet deep, 14ft long, and 8feet to the back.
dug by hand, and dirt removed in 5gallon buckets. We would fill and lift out about 30buckets to load in the truck to be moved and dumped. Still isn't completed to the above ground structure. Won't mention the amount of concrete need to do floor/walls, and a 4inch rebar reinforced top. It was extra special when the temp was pushing over 100degrees.

Last edited by RoninPhx; 05/28/16.

THE BIRTH PLACE OF GERONIMO