Originally Posted by slumlord
I call BS on a 45ft high berm.



They only had a 25ft around Hemlock Semi Conductor. And that was a $3 billion megasite.


I was thinking the same thing. Take a lot of dirt to make a berm that high. In Florida, that would create your own sinkholes.