It’s septic field line approved (permit specific) in TN
No sand? I was figuring outlaw.
That dirt pictured is rated “good” enough you actually get a reduction credit by using the 36” infiltrator. It’s bottom land dirt. I think it was 400’ for a 4 bedroom system. Close to that anyway . You just backfill with the native dirt . No sand or aggregate needed.