Thanks Tom!
each dam will contain 2.5 yards and we have 6 of them to make. going to do it in stages, pour a footer for each one, then come in a day or two later and pour the walls. it's going to be an open system with a dirt core. 4' high, span is 13' with a 3' spillway, so pretty small.